We are putting transmission towers leaving some if the plants, but of course, not the whole line. We only have an " object" of the tower, so no pieces of it. I'm not sure what we would need to place to make something like that for you. We will explore nearly anything, at least try.
I'm working on the proposed Thayer Creek project near Angoon. This is a comparatively tiny facility, a 10 foot dam upstream, buried 42" PVC pipeline parallel to the creek, to below a falls where the small little powerhouse will reside by the creek, total cost about $1,000,000. This us a good location because salmon cannot get up the falls, so putting it here would not interfere with their habitat. Problem is, in the sim, Thayer Creek goes up the sides of the hills, etc...it isn't in a basin. So I'm going to have to build the basin for the creek. This is about a 10 mile long project. Then I'll have to make an abrupt change in height to create the falls. They do mention in the proposal that some heli work will be necessary, so a pad near the powerhouse. The trail up to the dam will be ATV accessible only. Not very exciting as a result product but it will be fun to build. This will have about 6 miles of transmission lines to Angoon, maybe something maintenance wise in that stretch?
These locations are helicopter intensive. Thayer Creek won't have any place to land a float plane. So it is a very different kind of project for us.